Metabrasive  Bilston, West Midlands

In 1997 Metabrasive of Bilston (West Midlands) required a new facility to melt down scrap metal. The challenge of the project was to integrate the huge structure into an existing industrial landscape.

PCPT Architects were appointed to provide an environmental impact assessment for the project with detailed design and planning approval for the first stage and were also appointed to continue with the project to construction completion including working drawings and a construction information packet.